Building Material

Songkhla Canning


Songkhla Canning
Pain Point/Need:

Customer need to repair boiler wall and deteriorate refractory inside

Action:

EPS repair the boiler wall and analyze the root cause to select the right refractory to this boiler application and provide modernized installation techniques to fulfill customer need.

Result:

When choosing the appropriate and modern refractory, It will double the boiler service lifetime and reduce the energy consumption up to 10%.


Pain Point/Need:

Utilizing free space on the building roof to produce electricity from solar power.

Action:

EPS provided EPC service including engineering, procurement, and installation for 1.5 MWp Solar roof project.

Result:

Reduce electricity purchasing from PEA

Siam Refractory Industry Company


Siam Refractory Industry Company

The Siam Sanitary Fittings


The Siam Sanitary Fittings
Pain Point/Need:

Due to factory expansion, new production building and warehouse are constructed. Mechanical, Electrical, and Plumbing (MEP) system are required in new building.

Action:

EPS repair the boiler wall and analyze the root cause to select the right refractory to this boiler application and provide modernized installation techniques to fulfill customer need.

Result:

New production building and warehouse are fully built with system work.