Building Material
Songkhla Canning
Pain Point/Need:
Customer need to repair boiler wall and deteriorate refractory inside
Action:
EPS repair the boiler wall and analyze the root cause to select the right refractory to this boiler application and provide modernized installation techniques to fulfill customer need.
Result:
When choosing the appropriate and modern refractory, It will double the boiler service lifetime and reduce the energy consumption up to 10%.
Pain Point/Need:
Utilizing free space on the building roof to produce electricity from solar power.
Action:
EPS provided EPC service including engineering, procurement, and installation for 1.5 MWp Solar roof project.
Result:
Reduce electricity purchasing from PEA
Siam Refractory Industry Company
The Siam Sanitary Fittings
Pain Point/Need:
Due to factory expansion, new production building and warehouse are constructed. Mechanical, Electrical, and Plumbing (MEP) system are required in new building.
Action:
EPS repair the boiler wall and analyze the root cause to select the right refractory to this boiler application and provide modernized installation techniques to fulfill customer need.
Result:
New production building and warehouse are fully built with system work.